Change control and variations

This document is only available with a paid isurv subscription.

The change control log should, as a minimum, consist of the items indicated in the table below. Change control log: [Project name] CO No. Date raised Description of change Cost estimate Cost status Action Comments Latest date for action                                                     Total             This log should be maintained so that an updated copy can be produced at the regular change control meetings and a...