Substructure issues

This document is only available with a paid isurv subscription.

Even in a listed building a concrete floor may have been laid to replace older flooring, on the assumption that concrete is the superior material. However, the detailing must take into account practical workmanship issues. A line drawn on a plan to represent a damp-proof membrane is probably one of...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for 1 month!

You can now get unlimited access to all isurv channels with our 1-month pass, available for only £39. To find out more, enquire with our team using our form.

Sign up for the isurv newsletter to receive a monthly round-up of the latest isurv updates.

For further support, please contact us by emailing isurv@rics.org or calling +44 (0) 247 686 8584