Critical path analysis
This document is only available with a paid isurv subscription.
The various logic links referred to above can have periods of times assigned to them, to dictate a period between the start and/or finish of one activity and the start and/or finish of the succeeding activity. These are generally referred to as leads and lags.
Figure 5: Lead
The example above shows...