How to dry out buildings

This document is only available with a paid isurv subscription.

The drying process can be described as having three phases: removal of liquid water (pumping out, wet vacuuming, wet carpet removal, etc.) drying of material surfaces and drying of the material. Standing water should be physically removed prior to drying. This could be present: in lower parts of the building, e.g. below ground spaces, such as...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for 1 month!

You can now get unlimited access to all isurv channels with our 1-month pass, available for only £39. To find out more, enquire with our team using our form.

Sign up for the isurv newsletter to receive a monthly round-up of the latest isurv updates.

For further support, please contact us by emailing isurv@rics.org or calling +44 (0) 247 686 8584