Measurement conventions
This document is only available with a paid isurv subscription.
In the 1st edition of NRM 2 the provision of earthwork support was deemed to be included, however, NRM 2, 2nd edition re-introduced the need to include earthwork support to all faces of excavation over 250mm deep in the measured work.