Berths 8 and 9 At Felixstowe, the 2 latest container terminals at berths 8 and 9 were completed in September 2011 with an overall length of 920m. Berth 9 was subsequently extended by a 190m-long pier, which was opened in November 2015. In 2011, the cost of constructing berths 8 and 9...