Design and Construction Version – June 2018

This document is only available with a paid isurv subscription.

In June 2018 the ICC produced revised versions of the Infrastructure Conditions of Contract in relation to: Design and Construct Version; and Target Costs Version. Design and Construction Version – June 2018 This provides that Design Works relate to the Permanent Works as defined. There is scope for the Employer Designed Works as part of...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for 1 month!

You can now get unlimited access to all isurv channels with our 1-month pass, available for only £39. To find out more, enquire with our team using our form.

Sign up for the isurv newsletter to receive a monthly round-up of the latest isurv updates.

For further support, please contact us by emailing isurv@rics.org or calling +44 (0) 247 686 8584