Valuations

This document is only available with a paid isurv subscription.

Guidance notes for the relevant contract type should be checked to see how off-site materials are dealt with in the differing available contracts. Stored on-site Materials on-site may be included in an interim certificate, provided that they are: not prematurely brought to site protected from weather and damage within the site area and for incorporation into the...