Tendering

This document is only available with a paid isurv subscription.

Many large infrastructure programmes are moving towards using ‘baselines’ as a performance measurement tool. A baseline is used to measure how performance deviates from the original planned cost, schedule and scope. For performance measurement to be meaningful, an accurate baseline is required. A project’s baseline is defined as the original scope, cost...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for 1 month!

You can now get unlimited access to all isurv channels with our 1-month pass, available for only £39. To find out more, enquire with our team using our form.

Sign up for the isurv newsletter to receive a monthly round-up of the latest isurv updates.

For further support, please contact us by emailing isurv@rics.org or calling +44 (0) 247 686 8584