Temporary works in infrastructure

This document is only available with a paid isurv subscription.

It is important to also give brief consideration to life cycle cost planning. The designer is obliged to consider how a system may be ‘de-constructed’ after use and the commercial manager must therefore be aware of end of life costs for the removal of infrastructure once no longer needed. It...