Measurement techniques

This document is only available with a paid isurv subscription.

The first step in the investigation of a problem building is to carry out a thorough inspection of the building for defects. The next steps are to: establish moisture contents in affected materials, such as timber, plaster, masonry, insulation materials and textiles establish the humidity, temperature and dew point in the environment (both...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for 1 month!

You can now get unlimited access to all isurv channels with our 1-month pass, available for only £39. To find out more, enquire with our team using our form.

Sign up for the isurv newsletter to receive a monthly round-up of the latest isurv updates.

For further support, please contact us by emailing isurv@rics.org or calling +44 (0) 247 686 8584