Carrying out the contract works
This document is only available with a paid isurv subscription.
The contractor is obliged to complete the design for the contractor’s designed portion (CDP) in accordance with the contract documents (clause 2.2.1). The contractor will not take responsibility for the design contained in the employer’s requirements (clause 2.13).
The architect/contract administrator is responsible for integrating the design of the CDP with...