Using pre-tender estimates
This document is only available with a paid isurv subscription.
A pre-tender estimate is the last cost check of the project before it is issued to tender. The design should be sufficiently developed to allow specification levels and construction methodology to be determined, in this way the estimate should be a very accurate reflection of the works.
During the detailed design...