Using the JCT Minor Works Contract
This document is only available with a paid isurv subscription.
The JCT Minor Works Building Contract (MW) 2024 is the current JCT contract updated from the Minor Works Building Contract 2016.
The key revisions are:
Article 3 Collaborative working
Article 5 CDM Regulations Principal Designer and Principal Contractor
Article 6 Building Regulations – Principal Designer and Principal Contractor
revised insurance references
fluctuations
electronic notices which reflect current...
Explore the subscription options here to get full access to isurv, including downloads.
Try isurv for free!
You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.
Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.
For further questions, don't hesitate to call: +44(0)247 686 8555.