Latest in inclusive design

This document is only available with a paid isurv subscription.

Approved Document M Part M is divided into two separate sections: one dealing with buildings other than dwellings, i.e. requirements M1, M2 and M3 and the other with dwellings i.e. requirements M4. Volume 1 deals with M(4) and volume 2 with M(1), M(2) and M(3). Approved Document M Volume 1 (dwellings) The requirements referred to as M4(1), M4(2)...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for 1 month!

You can now get unlimited access to all isurv channels with our 1-month pass, available for only £75. To find out more, enquire with our team using our form.

Sign up for the isurv newsletter to receive a monthly round-up of the latest isurv updates.

For further support, please contact us by emailing isurv@rics.org or calling +44 (0) 247 686 8584