The Construction (Design and Management) Regulations 2015
This document is only available with a paid isurv subscription.
Every construction project must have a construction phase plan. It is the responsibility of the contractor, or a principal contractor where appointed, to prepare this before construction work begins. The client must be satisfied that the plan provides adequate control of health and safety risks.
The purpose of the plan is...