Cost management change control log
Changes within construction projects are inevitable, but should be kept to a minimum and, when they do occur, controlled rigorously. For this to happen, there must be an adequate strategy and sufficient supporting documentation to record and manage the change control process.
This is a sample change control log for recording these changes.
- File type: PDF
- Size: 44.3 KB
Your download should start automatically;
if it doesn't please click below.
In some browsers you may need to click the security bar at the top or bottom of the screen and select to download the file.
To manually start the file download, use the link below.