Document downloads - Valuations for interim certificates
Available downloads
-
Surveyors' construction handbook: valuations for interim certificates (ARCHIVED)
This document has been archived and is available on isurv for information purposes only.
Any questions relating to its status and application should be addressed to the RICS QS and construction professional group. -
Contracts valuation form
A sample valuation form for use with JCT contracts (in PDF and Excel format).
-
Contract administration (ARCHIVED)
This document has been archived and is available on isurv for information purposes only.
The purpose of this guidance note is to provide practical guidance to RICS members in England and Wales who undertake the role of 'contract administrator' (CA).
The role of the CA covers a wide range of possible services and projects from the smallest residential scheme through to larger commercial projects. The responsibilities of the CA will be defined by the form of building contract and the professional appointment under which the CA is appointed. As the majority of surveyors only deal with small to medium sized contracts, this guidance note will concentrate on the role of CA at this level; and in particular within the provisions of contracts issued by the Joint Contracts Tribunal (JCT - minor works, intermediate and standard building contracts). In addition, many of the principles set out in this guidance note will also apply where no standard form of contract has been entered into, particularly for smaller works. While the guidance note does not deal with full 'design and build contracts, the issue of the employer's responsibility for design is considered.
On this basis it should be noted that this guidance note does not cover other forms of JCT contract, GC works, BPF/NEC or ICE forms, other than to distinguish the role of the CA. It also does not deal with the responsibilities of employers' representatives under design and build arrangements, where the responsibility is to act exclusively in the interests of the employer, albeit honestly and with integrity. -
Contracts notice of non-completion
A sample notice of non-completion for use with JCT Design and Build contracts (in PDF and Word format).
-
Contracts pay less notice
A sample pay less notice for use with JCT contracts (in PDF and Word format).
-
Performance bonds form
While there is no industry standard form for performance bonds, one in common circulation and widely used is the Association of British Insurers’ Model Form.
Advice should be sought on its use however, as it requires additional drafting to provide the level of protection an employer may require. In its standard form, it does not provide for a call to be made in the event of insolvency which is covered by a contractual provision in the underlying contract. -
Interim valuations and payment
Published August 2015
Effective from 12 November 2015
Reissued April 2025
Most construction contracts require interim payments to be paid to the contractor. This is to relieve the contractor of the burden of financing the whole of the works until completion, which can take many months or years.
This practice information is effective from 12 November 2015.
This document covers:
• conditions of contract
• payment mechanisms
• retention
• valuation process and
• standard forms and covering letters.
This document was reissued in April 2025 as practice information. It had previously been published in August 2015 as a guidance note. No material changes have been made to the document.