Cost factors

This document is only available with a paid isurv subscription.

Dredging Wider and deeper shipping channels become necessary as ship sizes continue to increase. Consequently, more dredging and the disposal of more dredged material is required. Where the channel bed consists of sand or clay, the unit cost of dredging is relatively low but rises substantially where rock is encountered....

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.